Provider of integrated heat resisting
solutions for metallurgical glass and
petrochemical furnaces worldwide
Take multiple measures to ensure delivery
Quick response LMM are able to respond very quickly by advance planning, analyzing and controlling the factors that affect delivery. Including designing in advance, early purchase of molds and bought-out parts, in particular imported items.
Project planning Each project includes a project planning meeting to clarify the project plan, execution nodes and follow-up inspections.
Production schedule control The project operation department and the manufacturing centre jointly control the production schedule, and the project dispatch tracks the production schedule.
Procurement and logistics control The project operations department and the purchasing departments jointly control the purchase of raw materials and outsourced parts, plus they plan the tracking, and quality control activities.
Logistics control The logistics team plan the route to ensure speedy despatch and delivery. The factory is close to Qingdao sea-port, airport and the China- Europe exress railway station.